14-09-2017, 07:04 AM
(This post was last modified: 14-09-2017, 07:09 AM by Tony Press.)
Your Cutout and fuse box is as noted a Lucas CF1 - it will be marked with something like 6VER 9 28 on the face below the fuse.
This is earthed through the base so needs all paint removed and if mounted on a wooden board have an earth wire fitted.
The missing 'A' terminal looks to have been replaced with a connector underneath wired up to the cutout coil. The 'D' terminal which is still in place connects through the fuse to the cutout switch.
If you have the original CAV Lucas DEL Dynamo with two terminals +D and SH, the summer/winter charging rate is via a built in resistance in the field windings - connecting the D and SH terminals shorts this resistance out and produces full charge.
As you know this is a third brush dynamo where the final full charge rate is set by moving the third brush.
The switchboard you picture is a Lucas SM5 which is be correct for the DFL and CF1 combination, but the extra switch could indicate the SM5, which incorporates a summer/winter charge setting, is not working properly.
The rats nest of wired behind your SM5 should be removed and a new set of wiring installed as you suggest. Don't refer to the later wiring diagrams - look at the simple 1929 wiring diagram in the Handbook.
Have a look at Handbook 619c http://archive.a7ca.org/wp-content/uploa...7_619C.pdf page 36.
Cheers, Tony.
This is earthed through the base so needs all paint removed and if mounted on a wooden board have an earth wire fitted.
The missing 'A' terminal looks to have been replaced with a connector underneath wired up to the cutout coil. The 'D' terminal which is still in place connects through the fuse to the cutout switch.
If you have the original CAV Lucas DEL Dynamo with two terminals +D and SH, the summer/winter charging rate is via a built in resistance in the field windings - connecting the D and SH terminals shorts this resistance out and produces full charge.
As you know this is a third brush dynamo where the final full charge rate is set by moving the third brush.
The switchboard you picture is a Lucas SM5 which is be correct for the DFL and CF1 combination, but the extra switch could indicate the SM5, which incorporates a summer/winter charge setting, is not working properly.
The rats nest of wired behind your SM5 should be removed and a new set of wiring installed as you suggest. Don't refer to the later wiring diagrams - look at the simple 1929 wiring diagram in the Handbook.
Have a look at Handbook 619c http://archive.a7ca.org/wp-content/uploa...7_619C.pdf page 36.
Cheers, Tony.

