23-12-2025, 06:20 PM
(This post was last modified: 24-12-2025, 05:25 PM by Henry Harris.)
After being delayed by two extended hospital stays I can report progress on the MV/TT project.
In September this year I began making a new floor assembly for the TT body There was not a lot to go on so a lot of time was spent studying the detail of period photos and photos of the surviving car(s).
I also have some tracings that I took from GW when owned by Adli.
The original coach builders drawing has also been rather useful.
https://archive.a7ca.org/collections/tec.../td0208-2/
https://www.flickr.com/photos/henryharri...3/sizes/k/
I started with the front and rear transmission tunnels.
The main floor panels were folded with a sheet metal folder
The side flanges were formed with a hammer and dolly
The banjo cover has been rather tricky, it will get some gentle planishing later.
These pics are from this morning.....
The body shell front flange has been restored by Martin Whittaker (It was cut off by a previous owner)
In September this year I began making a new floor assembly for the TT body There was not a lot to go on so a lot of time was spent studying the detail of period photos and photos of the surviving car(s).
I also have some tracings that I took from GW when owned by Adli.
The original coach builders drawing has also been rather useful.
https://archive.a7ca.org/collections/tec.../td0208-2/
https://www.flickr.com/photos/henryharri...3/sizes/k/
I started with the front and rear transmission tunnels.
The main floor panels were folded with a sheet metal folder
The side flanges were formed with a hammer and dolly
The banjo cover has been rather tricky, it will get some gentle planishing later.
These pics are from this morning.....
The body shell front flange has been restored by Martin Whittaker (It was cut off by a previous owner)

