12-04-2019, 07:27 PM
I Hi Mike
I’d need to wait a while, my new grandson is only 8 weeks old!
By the way, by tea time today the gearbox and propshaft are in!!
Fettling was required on the HardySpicer yoke as a very small amount of grinding
Needed to allow the Nyloc nuts to bolt up, plus
The clutch pedal cotter pin hole needed reaming slightly as the
New cotter was reluctant to go through.
At this stage of the build everything seems to need
“Fitting” I now know why the best engineers to ask were fitters,
when I worked at Barr&Stroud’s periscope factory!
I think I’ll try and fit the brake light switch while
the floors are still up.
I’ve been putting off installing the engine but it looks like it will
go in next week, but still lots to do before starting it up.
Regards
Bill G
I’d need to wait a while, my new grandson is only 8 weeks old!
By the way, by tea time today the gearbox and propshaft are in!!
Fettling was required on the HardySpicer yoke as a very small amount of grinding
Needed to allow the Nyloc nuts to bolt up, plus
The clutch pedal cotter pin hole needed reaming slightly as the
New cotter was reluctant to go through.
At this stage of the build everything seems to need
“Fitting” I now know why the best engineers to ask were fitters,
when I worked at Barr&Stroud’s periscope factory!
I think I’ll try and fit the brake light switch while
the floors are still up.
I’ve been putting off installing the engine but it looks like it will
go in next week, but still lots to do before starting it up.
Regards
Bill G
Based near the Scottish Border,