While welcoming the return of Flying Scotsman, I can't help wondering whether the latest £4.5m would have been better spent elsewhere.
This loco has always been an infinitely deep money pit. It bankrupted Alan Pegler, then Bill McAlpine and Pete Waterman found it too expensive to hang on to. Its next owner, Tony Marchington, spent well over a million on it only about fifteen years ago and was bankrupted by it and now the NRM has gone vastly over-budget on the latest overhaul.
The very similar, all-new-build Tornado cost around £3m from scratch.
Not sure if you're aware this down under, but following on from the new build Tornado mentioned by Martin above, this is the next totally new build taking place just down the A1(M) from me in Darlington at an estimated cost of £5 million over 7 to 10 years. They've made some very good progress so far. The /news/current-news page shows construction and pattern making to date.
Location: Almost but not quite, the far North East of England
Dave Mann
Feb 26, 2016 - 9:19PM
Re: That train again
Ah well it struck me as a bit peculiar that having stripped it down to the frames, cleaned it up, checked it, painted them and refitted wheels and cylinders and then found cracks in the frames by the horn guides. Then it was sent to Ian Riley who welded up the cracks and then found that the holes in the frames for mounting the cylinders were beyond redemption so the front of the frames were replaced. I think it's fair to say that it put in some sterling service in private ownership, in the UK, USA and Australia over about 50 odd years which has obviously taken it's toll.
We were just reminiscing about the Flying Scotsman visit to Australia on the Meccano mailing list.
I was Chief Engineer Mobil Australia and was reminded that at the time they made an excellent film of the visit which is now available on the internet-
https://www.youtube.com/watch?v=i6lTyIq2euY
As noted I believe it did more running here than it had for many years.
Whilst agreeing that the costs are mind-boggling, unfortunately what effort to preserve anything historic isn't. My only purpose in starting the post on an Austin 7 site was I feel that both projects really started around the same time and together were synonymous in demonstrating British brilliance in engineering expertise & forward thinking. Proof is that 93 years later they're both still around. Cheers, Bill in Oz
I would suggest that the £3.5m or whatever it cost was money well spent. The UK Government will spend this sort of money without hesitation on an 'inquiry' which several years later will be kicked into the long grass and forgotten.
At least we didn't send it to China to get it restored. Mind you if it had come back as the 'Frying Scotsman' it might have got some good publicity.