It's not the 5/16" OD pipe that I'm struggling with its the banjo that bolts to the carb. I know that, as standard, these were soldered on to the pipe and then use a soldered on nipple with cover nut at the fuel pump end. I have the fuel pump end done (using 1/4" OD pipe) but cannot seem to find a solder on banjo for 1/4" OD pipe as they seem to be more scarce than hens teeth......
Any idea where I can get one? My preference is to keep the fuel line as 1/4" if at all possible...
Really looking forward to mid April when the body arrives from Rod Yates! Should really see something looking more like a car in the workshop then :-)
I've been working on the project now for 18 months and can honestly say that other than the gearbox(I was chicken!) I have had every single nut, bolt and washer off and stripped, cleaned, restored and reassembled. Its a slow process but a very pleasing one..